Share

Feedback

News

Get updated about news, events and contributors experiences

Featured in news:

Updates about the Dutch Environment and Planning Act

Developments happen fast in the field of Dutch Environment and Planning Law and have implications for the flood risk safety-norms, instruments and procedures. Here we list the updates from the corona time (April and March/2019) about the most important developments to keep AllRisk partners and interested users up-to-date.

01/04/2020 by Monica Lanz

View details

Past Events

We joined or organized several events to share and discuss our research.

Past Events

Blogs

Here we reflect on the challenges or experiences from the implementation of the new flood risk standards.

Blogs

News and Press

Featured news about All-Risk related topics or locations studied.

News and Press

Newsletters

Newsletters and related contributions prepared by the researchers to update interested organizations.

Newsletters

Sign up for our newsletter

If you want to stay up to date, sign up for our newsletter with your name and email address.

Blogs

Featured in blogs:

Which of the major challenges in Houston could we tackle together with Dutch expertise?

Matthijs Kok (TUDelft) interviewed Dr Charlie Penland, principal at the engineering firm Walter P in Houston, with 21 USA and five international offices. Charlie's special interest is in "low-impact" development, hydraulic design, hydrologic analysis, and flood protection.

27/09/2021 by Prof. dr. ir. Matthijs Kok

View details

Which of the major challenges in Houston could we tackle together with Dutch expertise?

27/09/2021 by Prof. dr. ir. Matthijs Kok

Matthijs Kok (TUDelft) interviewed Dr Charlie Penland, principal at the engineering firm Walter P in Houston, with 21 USA and five international offices. Charlie's...

View blog

From working in exploration projects to playing in an orchestra: Tips for science-practice collaboration

04/03/2021 by Juliette Cortes Arevalo

Roula Dambrink and Maartje van Dijk, are the All-Risk former and current program officers from the Netherlands Organisation of scientific research (NWO). They both...

View blog

Joint HWBP and All-Risk effort to make maximum use of the results of the sheet pile test in Eemdijk

31/01/2021 by Prof. dr. ir. Matthijs Kok

The paths of Matthijs Kok (program leader of All-Risk), Arny Lengkeek (advisor geotechnical engineering with 20 years of experience and PhD student in All-Risk...

View blog

Interview with Jan Hateboer (Fryslân water board): dike reinforcement requires area-based collaboration

28/01/2021 by Martijn van Staveren

Jan Hateboer (project manager at Fryslân water board) shares in an interview with Martijn van Staveren (All-Risk researcher) his experiences with the implementation of...

View blog

All blogs (8)

Events

Featured in events:

All-Risk Users Day (Gebruikersdag)

With about 70 participants, seven speakers and four parallel sessions we reflected on the All-Risk progress with interested dike professionals 'dijkwerkers'. Here you can find the presentations of this meeting (in Dutch) and download the report with the research summaries (in English).

27/09/2019 by Wim Kanning

View details

12/05/2022

Dijkwerkersdag 2022 - Towards Improved Flood Defences

On Thursday, May 12, 2022, the annual Dike Day will take place in theatre Spant! in Bussum. The research team of All-Risk will take this opportunity to present their e-book as input for the discussions and activities planned for this day.

View event

13/10/2021

Reflection: Looking beyond reinforcement

Implementing large-scale infrastructure projects for flood risk management requires good collaboration between water authorities, municipalities, landowners and societal organisations.

View event

27/05/2021

Reflection: Data-driven dike enforcements - Constructive feedback from new and historical sources

The technical assessment of dike reinforcement projects in the Netherlands is flooded with data. Before, during and after dike reinforcements, a lot of data is collected and stored. This webinar attempts to bridge the gap between conventional and new data sources by presenting new methods for improving dike safety through data and discussing the general use of different data sources.

View event

02/06/2021

Reflection: Foreshores - useful for manageable flood safety or just beautiful nature?

In the 19th and early 20th centuries, salt marshes were mainly created for agriculture in the North of the Netherlands. More recently, we have reconsidered the value of these vegetated foreshores for flood safety.

View event

04/10/2021

Reflection: Risk-based inspection and interactions between failure mechanisms

Safety standards of flood defences are based on probabilities of flooding. Using a variety of failure models and statistical methods, we try to assess these probabilities as good as possible, in order to take effective measures for flood risk reduction. The question is how well we actually have insight into the flooding probability, and whether we take all relevant factors into account.

View event

14/06/2021

Reflection: Macro stability - better parameters or models or do we need to reinforce the dikes?

Macro instability of the inner slope is an important failure mechanism that has a large influence on the costs of dike reinforcements and their impacts on the landscape. There are various uncertainties considering the strength parameters and models. There seem to be various options when a dike does not meet the standards: better parameter estimation, better models, or realize a conservative and expansive reinforcement. Which options could we explore to deal with macro instability in an efficient manner?

View event

All events (12)

News

Featured in news:

Your opinion matters to understand the governance of flood protection projects - Ongoing survey

Are you currently involved you in or have knowledge about one the projects of Dutch Flood Protection Program (HWBP in Dutch)? Then, you can support our researchers from the Law, governance and implementation theme in their survey study!

28/09/2020 by Emma Avoyan

View details

Cross-Project Macro Stability Exploration (in Dutch)

22/11/2021

Within the total tasking of the Flood Protection Programme, the failure mechanism macro stability is the most important cost item for dike sections that...

View details

Eemdijk test: dike with sheet piles has collapsed (in Dutch)!

21/03/2018

The test dike with sheet piles collapsed on March 17 around 4 pm. The results of this trial will be used by all dike...

View details

PhD Defence - Wave propagation over foreshores

03/11/2021 by Christopher H. Lashley

View details

High water in Limburg during the summer 2021

11/10/2021 by Prof. dr. ir. Bas Jonkman

Commissioned by the Dutch Expertise Network for Flood Protection (ENW), a broad consortium of knowledge institutions, led by Delft University of Technology and Deltares,...

View details

All news (8)

Newsletters

Featured in newsletters:

All-Risk newsletters

From now on until March 2022, the All-Risk newsletter will be published approximately every six months. Each newsletter will feature one of the five project themes to introduce you to the researchers and the partners who have so far benefited from All-Risk work.

25/06/2020 by Juliette Cortes Arevalo

View details

Digital magazine of the Flood Protection Program

29/09/2020 by Prof. dr. ir. Matthijs Kok

The Flood Protection Program (also known in Dutch as HWBP), an alliance of the 21 water regional authorities and the Dutch Ministry of Water...

View newsletter

All-Risk newsletters

25/06/2020 by Juliette Cortes Arevalo

From now on until March 2022, the All-Risk newsletter will be published approximately every six months. Each newsletter will feature one of the five...

View newsletter

All newsletters (2)

Videos

Featured in videos:

Modelling the waves forces on innovative covers for dikes

We developed a numerical model to investigate the usage of Grassblocks, which are placed underneath the grass cover to protect the dike against the wave forces once the grass is eroded.

01/09/2021 by Dr. Jord Warmink

View details

Modelling the waves forces on innovative covers for dikes

01/09/2021

View video

The Wide green dike a pilot reinforcement project on the Wadden Sea area

21/04/2020

View video

All videos (2)